As part of the Ohio Department of Transportation District 9’s Planning Department, the district’s Environmental Office is seeking public input for a project to replace a culvert on Tar Hollow Road in Ross County.
ROS-Tar Hollow Culvert FY 2024 (PID: 109380) - It is proposed to replace a culvert and headwalls on Tar Hollow Road to maintain access to the Group Camp area within Tar Hollow State Park. The project is located in a rural area of Colerain Township.
The existing culvert is a 48” corrugated metal pipe (CMP) with concrete headwalls. The new culvert will be a 60” concrete pipe.
The project will not require new right-of-way and no homes or businesses will be removed by the project.
The roadway will be closed for the duration of the project. Construction will occur when the Group Camp area is closed.
The funding for the project is 100 % State. The environmental commitment date is 4/1/2023.
Written comments should be submitted by February 18, 2023, or the deadline date that is posted on the web site, to: Brandon Beck, ODOT District 9 Environmental Supervisor, 650 Eastern Avenue, Chillicothe, Ohio 45601 E-Mail: Brandon.Beck@dot.ohio.gov